Wind development recordsFIPS 48353Not a lease-rate estimate

Wind development data in Nolan County, Texas

Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.

9Active queue requestsLBNL Queued Up interconnection queue dataset
769 MWActive requested capacityRequested, not built
12Operating facilitiesEIA-860 final annual generator inventory
249 miTransmission in countyHIFLD electric power transmission lines

Interconnection queue requests

Queue activity

Source: LBNL Queued Up interconnection queue dataset. Queue requests are proposals seeking interconnection; they are not planned or operating facility counts.

Active queue requests

9

Tracked requests currently marked active

Active requested capacity

769 MW

Requested capacity attributed to this county

2019-2025 complete years

0122019: 0 requests2020: 0 requests2021: 0 requests2022: 1 requests2023: 2 requests2024: 1 requests2025: 2 requests2019202020212022202320242025
Tracked requests per complete year
YearTracked requests
20190
20200
20210
20221
20232
20241
20252

Facility facts

Planned and operating facilities

Planned facilities

0

0 MW · EIA-860 final annual generator inventory

Operating facilities

12

2,072 MW · EIA-860 final annual generator inventory

Queue request status is not used as a substitute for facility construction or operating status.

Independent operating inventory

Wind facilities

19

U.S. Wind Turbine Database (USWTDB)

Installed turbines

1,349

Individual turbine records in this county

Observed capacity

2,173 MW

Source release 2026-06-26

Latest operation year

2025

Latest source record represented in this county

This inventory is shown separately from EIA generators and LBNL queue requests to avoid double-counting records across datasets.

Retirement facts

Facility retirements

The EIA-860 final annual generator inventory lists no retired wind facilities in Nolan County.

Public record attribution

Organizations named in queue requests

OrganizationQueue requestsCapacityLatest request year
Leeward Energy210.3 MW2018
ACE DEVCO NC, LLC1200.3 MW2025
Buffalo Gap Wind Farm 2, LLC1231.5 MW2024
Buffalo Gap Wind Farm, LLC1120.2 MW2025
Buzzi Unicem USA118 MW2023
Champion Wind Farm, LLC10.3 MW2023
Maryneal Windpower, LLC1182.4 MW2016
TRENT WIND FARM LLC16.4 MW2017

A name in an interconnection queue request does not mean the organization is seeking land in this county or has an interest in a particular parcel.

Infrastructure context

Grid infrastructure context

Source: HIFLD electric power transmission lines.

Transmission in county

249 miles

Highest recorded voltage

345 kV

Nearest line to county center

2.9 km

County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.

Private comparable contribution

Have an actual offer or signed lease from this county?

Public development records do not tell us what a landowner was offered. Directly submitted terms enter a separate private review workflow and never become a raw public record.

Private submission · reviewer verification required

Share a real wind offer or signed lease

If you have been approached about wind land here, or have already signed, the terms you remember can help build future comparable coverage for Nolan County. A submission does not mean this county currently has comparable coverage. Terms stay private during review, and no raw terms or parcel identity are published.

Source: terms you submit directly, not a public agency dataset. See verification, document retention, and deletion details in the privacy policy.