Development signal · Zapata County, TX · FIPS 48505

Solar development data in Zapata County.

Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.

County-specific public records

Development activity

Active projects

6

Tracked public records currently marked active

Active capacity

1,029 MW

Capacity attributed to this county

Nearest active project

Not available

County-centroid distance, not parcel distance

Five-year public queue activity

YearTracked requests
20220
20232
20240
20250
20260

Public record attribution

Organizations named in public development records

OrganizationProjectsCapacityLatest request year
Rio Grande River Solar LLC2155.6 MW2021
Gransolar Texas Three LLC1154.1 MW2021
Ignis TX Solar Three LLC1104.9 MW2021
NextEra Energy Interconnection Holdings, LLC1359 MW2023
Sierra Madre Solar LLC1255.2 MW2020

A name in an interconnection record does not mean the organization is seeking land in this county or has an interest in a particular parcel.

Infrastructure context

Grid infrastructure context

Transmission in county

127 miles

Highest recorded voltage

345 kV

Nearest line to county center

3.3 km

County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.