Solar development recordsFIPS 48479Not a lease-rate estimate

Solar development data in Webb County, Texas

Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.

14Active queue requestsLBNL Queued Up interconnection queue dataset
3,150 MWActive requested capacityRequested, not built
2Operating facilitiesEIA-860 final annual generator inventory
293 miTransmission in countyHIFLD electric power transmission lines

Interconnection queue requests

Queue activity

Source: LBNL Queued Up interconnection queue dataset. Queue requests are proposals seeking interconnection; they are not planned or operating facility counts.

Active queue requests

14

Tracked requests currently marked active

Active requested capacity

3,150 MW

Requested capacity attributed to this county

2019-2025 complete years

02462019: 2 requests2020: 1 requests2021: 5 requests2022: 1 requests2023: 2 requests2024: 3 requests2025: 6 requests2019202020212022202320242025
Tracked requests per complete year
YearTracked requests
20192
20201
20215
20221
20232
20243
20256

Facility facts

Planned and operating facilities

Planned facilities

3

975 MW · EIA-860 final annual generator inventory

Operating facilities

2

210 MW · EIA-860 final annual generator inventory

Queue request status is not used as a substitute for facility construction or operating status.

Independent operating inventory

Large-scale solar facilities

2

U.S. Large-Scale Solar Photovoltaic Database (USPVDB)

Observed capacity

210 MW

Source release 2026-04-14

Mapped site area

1,545 acres

Converted from source-reported square meters

Latest operation year

2021

Latest source record represented in this county

This inventory is shown separately from EIA generators and LBNL queue requests to avoid double-counting records across datasets.

Retirement facts

Facility retirements

The EIA-860 final annual generator inventory lists no retired solar facilities in Webb County.

Public record attribution

Organizations named in queue requests

OrganizationQueue requestsCapacityLatest request year
DGC Renewables, LLC4628.2 MW2025
Gransolar Texas Two, LLC2612.5 MW2023
BayWa r.e. Solar Projects LLC1203.9 MW2019
Corazon Energy, LLC1202.6 MW2013
Corvus Solar, LLC1201.5 MW2024
El Molino Solar, LLC1201.3 MW2023
Guajillo Energy Storage LLC1204.8 MW2021
Hecate Energy Outpost Storage LLC1508.1 MW2021
Miracle Ranch LLC1221.6 MW2025
Pradera Solar, LLC1118 MW2021
Pradera Storage, LLC1153.1 MW2021
Renew Development HoldCo LLC1301.4 MW2025

A name in an interconnection queue request does not mean the organization is seeking land in this county or has an interest in a particular parcel.

Infrastructure context

Grid infrastructure context

Source: HIFLD electric power transmission lines.

Transmission in county

293 miles

Highest recorded voltage

345 kV

Nearest line to county center

8.5 km

County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.

Private comparable contribution

Have an actual offer or signed lease from this county?

Public development records do not tell us what a landowner was offered. Directly submitted terms enter a separate private review workflow and never become a raw public record.

Private submission · reviewer verification required

Share a real solar offer or signed lease

If you have been approached about solar land here, or have already signed, the terms you remember can help build future comparable coverage for Webb County. A submission does not mean this county currently has comparable coverage. Terms stay private during review, and no raw terms or parcel identity are published.

Source: terms you submit directly, not a public agency dataset. See verification, document retention, and deletion details in the privacy policy.