Solar development data in Scurry County, Texas
Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.
Interconnection queue requests
Queue activity
Source: LBNL Queued Up interconnection queue dataset. Queue requests are proposals seeking interconnection; they are not planned or operating facility counts.
Active queue requests
Tracked requests currently marked active
Active requested capacity
Requested capacity attributed to this county
2019-2025 complete years
| Year | Tracked requests |
|---|---|
| 2019 | 0 |
| 2020 | 2 |
| 2021 | 0 |
| 2022 | 1 |
| 2023 | 3 |
| 2024 | 4 |
| 2025 | 3 |
Facility facts
Planned and operating facilities
Planned facilities
0 MW · EIA-860 final annual generator inventory
Operating facilities
653 MW · EIA-860 final annual generator inventory
Queue request status is not used as a substitute for facility construction or operating status.
Independent operating inventory
Large-scale solar facilities
U.S. Large-Scale Solar Photovoltaic Database (USPVDB)
Observed capacity
Source release 2026-04-14
Mapped site area
Converted from source-reported square meters
Latest operation year
Latest source record represented in this county
This inventory is shown separately from EIA generators and LBNL queue requests to avoid double-counting records across datasets.
Retirement facts
Facility retirements
The EIA-860 final annual generator inventory lists no retired solar facilities in Scurry County.
Public record attribution
Organizations named in queue requests
| Organization | Queue requests | Capacity | Latest request year |
|---|---|---|---|
| Cedar Draw Solar LLC | 2 | 677.1 MW | 2024 |
| Fluvanna Max Solar LLC | 2 | 204.5 MW | 2024 |
| IP RENEWABLE ENERGY HOLDINGS LLC | 2 | 653.2 MW | 2020 |
| Inadale BESS, LLC | 1 | 287.2 MW | 2023 |
| Inadale Solar, LLC | 1 | 281 MW | 2023 |
| Maldives Solar LLC | 1 | 184 MW | 2023 |
| Scurry Solar, LLC | 1 | 503.5 MW | 2025 |
| SE DC Devco | 1 | 1,200 MW | 2025 |
| Zeus Scurry BESS | 1 | 1,043.1 MW | 2025 |
A name in an interconnection queue request does not mean the organization is seeking land in this county or has an interest in a particular parcel.
Infrastructure context
Grid infrastructure context
Source: HIFLD electric power transmission lines.
Transmission in county
Highest recorded voltage
Nearest line to county center
County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.