Active projects
Tracked public records currently marked active
Development signal · Scurry County, TX · FIPS 48415
Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.
County-specific public records
Active projects
Tracked public records currently marked active
Active capacity
Capacity attributed to this county
Nearest active project
County-centroid distance, not parcel distance
| Year | Tracked requests |
|---|---|
| 2022 | 1 |
| 2023 | 3 |
| 2024 | 4 |
| 2025 | 3 |
| 2026 | 0 |
Public record attribution
| Organization | Projects | Capacity | Latest request year |
|---|---|---|---|
| Cedar Draw Solar LLC | 2 | 677.1 MW | 2024 |
| Fluvanna Max Solar LLC | 2 | 204.5 MW | 2024 |
| IP RENEWABLE ENERGY HOLDINGS LLC | 2 | 653.2 MW | 2020 |
| Inadale BESS, LLC | 1 | 287.2 MW | 2023 |
| Inadale Solar, LLC | 1 | 281 MW | 2023 |
| Maldives Solar LLC | 1 | 184 MW | 2023 |
| Scurry Solar, LLC | 1 | 503.5 MW | 2025 |
| SE DC Devco | 1 | 1,200 MW | 2025 |
| Zeus Scurry BESS | 1 | 1,043.1 MW | 2025 |
A name in an interconnection record does not mean the organization is seeking land in this county or has an interest in a particular parcel.
Infrastructure context
Transmission in county
Highest recorded voltage
Nearest line to county center
County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.