Solar development recordsFIPS 48371Not a lease-rate estimate

Solar development data in Pecos County, Texas

Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.

19Active queue requestsLBNL Queued Up interconnection queue dataset
5,574 MWActive requested capacityRequested, not built
12Operating facilitiesEIA-860 final annual generator inventory
346 miTransmission in countyHIFLD electric power transmission lines

Interconnection queue requests

Queue activity

Source: LBNL Queued Up interconnection queue dataset. Queue requests are proposals seeking interconnection; they are not planned or operating facility counts.

Active queue requests

19

Tracked requests currently marked active

Active requested capacity

5,574 MW

Requested capacity attributed to this county

2019-2025 complete years

0510152019: 2 requests2020: 0 requests2021: 0 requests2022: 6 requests2023: 1 requests2024: 1 requests2025: 12 requests2019202020212022202320242025
Tracked requests per complete year
YearTracked requests
20192
20200
20210
20226
20231
20241
202512

Facility facts

Planned and operating facilities

Planned facilities

1

200 MW · EIA-860 final annual generator inventory

Operating facilities

12

2,070 MW · EIA-860 final annual generator inventory

Queue request status is not used as a substitute for facility construction or operating status.

Independent operating inventory

Large-scale solar facilities

12

U.S. Large-Scale Solar Photovoltaic Database (USPVDB)

Observed capacity

2,073 MW

Source release 2026-04-14

Mapped site area

12,610 acres

Converted from source-reported square meters

Latest operation year

2024

Latest source record represented in this county

This inventory is shown separately from EIA generators and LBNL queue requests to avoid double-counting records across datasets.

Retirement facts

Facility retirements

The EIA-860 final annual generator inventory lists no retired solar facilities in Pecos County.

Public record attribution

Organizations named in queue requests

OrganizationQueue requestsCapacityLatest request year
BOULEVARD ASSOCIATES, LLC41,815 MW2025
CENTURY GAS PROCESSING, LLC4546.3 MW2022
Glass Mountain Solar, LLC3912.6 MW2025
Recurrent Energy2250 MW2014
Wisdom Green Energy LLC2402.3 MW2025
174 Power Global Properties, LLC1182 MW2015
7x Energy1255.1 MW2018
Concho Bluff, LLC1255 MW2017
Emerald Grove Solar, LLC1108 MW2013
Greasewood II LLC1306.9 MW2019
Greasewood IV LLC1231.6 MW2024
Rio Vista Solar, LLC1553.7 MW2025

A name in an interconnection queue request does not mean the organization is seeking land in this county or has an interest in a particular parcel.

Infrastructure context

Grid infrastructure context

Source: HIFLD electric power transmission lines.

Transmission in county

346 miles

Highest recorded voltage

345 kV

Nearest line to county center

7.3 km

County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.

Private comparable contribution

Have an actual offer or signed lease from this county?

Public development records do not tell us what a landowner was offered. Directly submitted terms enter a separate private review workflow and never become a raw public record.

Private submission · reviewer verification required

Share a real solar offer or signed lease

If you have been approached about solar land here, or have already signed, the terms you remember can help build future comparable coverage for Pecos County. A submission does not mean this county currently has comparable coverage. Terms stay private during review, and no raw terms or parcel identity are published.

Source: terms you submit directly, not a public agency dataset. See verification, document retention, and deletion details in the privacy policy.