Solar development data in Milam County, Texas
Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.
Interconnection queue requests
Queue activity
Source: LBNL Queued Up interconnection queue dataset. Queue requests are proposals seeking interconnection; they are not planned or operating facility counts.
Active queue requests
Tracked requests currently marked active
Active requested capacity
Requested capacity attributed to this county
2019-2025 complete years
| Year | Tracked requests |
|---|---|
| 2019 | 1 |
| 2020 | 5 |
| 2021 | 6 |
| 2022 | 4 |
| 2023 | 2 |
| 2024 | 3 |
| 2025 | 5 |
Facility facts
Planned and operating facilities
Planned facilities
1,413 MW · EIA-860 final annual generator inventory
Operating facilities
450 MW · EIA-860 final annual generator inventory
Queue request status is not used as a substitute for facility construction or operating status.
Independent operating inventory
Large-scale solar facilities
U.S. Large-Scale Solar Photovoltaic Database (USPVDB)
Observed capacity
Source release 2026-04-14
Mapped site area
Converted from source-reported square meters
Latest operation year
Latest source record represented in this county
This inventory is shown separately from EIA generators and LBNL queue requests to avoid double-counting records across datasets.
Retirement facts
Facility retirements
The EIA-860 final annual generator inventory lists no retired solar facilities in Milam County.
Public record attribution
Organizations named in queue requests
| Organization | Queue requests | Capacity | Latest request year |
|---|---|---|---|
| Brahman Renewables | 2 | 303.7 MW | 2024 |
| Grenergy USA | 2 | 486 MW | 2025 |
| Rosula Solar LLC | 2 | 190.1 MW | 2023 |
| San Gabriel Solar LLC | 2 | 382.5 MW | 2025 |
| Ben Milam Solar 1 | 1 | 203 MW | 2019 |
| Ben Milam Solar 2 | 1 | 254 MW | 2020 |
| Ben Milam Solar 4 | 1 | 600 MW | 2024 |
| Ben Milam Solar 5 | 1 | 500 MW | 2025 |
| BT Jungmann LLC | 1 | 40.2 MW | 2020 |
| Camino Solar Project, LLC | 1 | 196.3 MW | 2022 |
| Cattlemen Solar Park II LLC | 1 | 150.6 MW | 2022 |
| EDP Renewables North America LLC | 1 | 244.9 MW | 2018 |
A name in an interconnection queue request does not mean the organization is seeking land in this county or has an interest in a particular parcel.
Infrastructure context
Grid infrastructure context
Source: HIFLD electric power transmission lines.
Transmission in county
Highest recorded voltage
Nearest line to county center
County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.