Solar development recordsFIPS 48321Not a lease-rate estimate

Solar development data in Matagorda County, Texas

Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.

17Active queue requestsLBNL Queued Up interconnection queue dataset
3,872 MWActive requested capacityRequested, not built
0Operating facilitiesEIA-860 final annual generator inventory
317 miTransmission in countyHIFLD electric power transmission lines

Interconnection queue requests

Queue activity

Source: LBNL Queued Up interconnection queue dataset. Queue requests are proposals seeking interconnection; they are not planned or operating facility counts.

Active queue requests

17

Tracked requests currently marked active

Active requested capacity

3,872 MW

Requested capacity attributed to this county

2019-2025 complete years

05102019: 1 requests2020: 9 requests2021: 2 requests2022: 3 requests2023: 4 requests2024: 3 requests2025: 0 requests2019202020212022202320242025
Tracked requests per complete year
YearTracked requests
20191
20209
20212
20223
20234
20243
20250

Facility facts

Planned and operating facilities

Planned facilities

2

252 MW · EIA-860 final annual generator inventory

Operating facilities

0

0 MW · EIA-860 final annual generator inventory

Queue request status is not used as a substitute for facility construction or operating status.

Independent operating inventory

The U.S. Large-Scale Solar Photovoltaic Database lists no large-scale solar facilities in Matagorda County as of its 2026-04-14 release.

This inventory is shown separately from EIA generators and LBNL queue requests to avoid double-counting records across datasets.

Retirement facts

Facility retirements

The EIA-860 final annual generator inventory lists no retired solar facilities in Matagorda County.

Public record attribution

Organizations named in queue requests

OrganizationQueue requestsCapacityLatest request year
RWE Solar Development, LLC4771.6 MW2021
Industrial November Project LLC31,006.2 MW2024
Eldora Energy LLC2402.3 MW2022
Duffy Energy Storage LLC1241.1 MW2023
HQC Solar Holdings 1, LLC1150 MW2023
Industrial Bravo Project LLC150.7 MW2022
Lavaca Bay Solar Project, LLC1243.5 MW2020
Matagorda Solar Farm, LLC1101 MW2020
Percy Farm Solar 1, LLC1198.6 MW2021
Running Iron Solar, LLC1204.7 MW2023
VDA Solar Texas 1 LLC1502.5 MW2020

A name in an interconnection queue request does not mean the organization is seeking land in this county or has an interest in a particular parcel.

Infrastructure context

Grid infrastructure context

Source: HIFLD electric power transmission lines.

Transmission in county

317 miles

Highest recorded voltage

345 kV

Nearest line to county center

0.2 km

County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.

Private comparable contribution

Have an actual offer or signed lease from this county?

Public development records do not tell us what a landowner was offered. Directly submitted terms enter a separate private review workflow and never become a raw public record.

Private submission · reviewer verification required

Share a real solar offer or signed lease

If you have been approached about solar land here, or have already signed, the terms you remember can help build future comparable coverage for Matagorda County. A submission does not mean this county currently has comparable coverage. Terms stay private during review, and no raw terms or parcel identity are published.

Source: terms you submit directly, not a public agency dataset. See verification, document retention, and deletion details in the privacy policy.