Active projects
Tracked public records currently marked active
Development signal · Limestone County, TX · FIPS 48293
Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.
County-specific public records
Active projects
Tracked public records currently marked active
Active capacity
Capacity attributed to this county
Nearest active project
County-centroid distance, not parcel distance
| Year | Tracked requests |
|---|---|
| 2022 | 4 |
| 2023 | 1 |
| 2024 | 1 |
| 2025 | 1 |
| 2026 | 0 |
Public record attribution
| Organization | Projects | Capacity | Latest request year |
|---|---|---|---|
| Gransolar Texas Sixteen, LLC | 2 | 102.1 MW | 2024 |
| J&J Solar Ranch LLC | 2 | 243.3 MW | 2025 |
| Diver Solar | 1 | 225.6 MW | 2022 |
| Fewell Solar LLC | 1 | 203.5 MW | 2021 |
| Gransolar Texas Fifteen, LLC | 1 | 77.6 MW | 2021 |
| Lavender Solar LLC | 1 | 183 MW | 2022 |
| NextEra Energy Interconnection Holdings, LLC | 1 | 206 MW | 2023 |
A name in an interconnection record does not mean the organization is seeking land in this county or has an interest in a particular parcel.
Infrastructure context
Transmission in county
Highest recorded voltage
Nearest line to county center
County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.