Solar development data in Hopkins County, Texas
Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.
Interconnection queue requests
Queue activity
Source: LBNL Queued Up interconnection queue dataset. Queue requests are proposals seeking interconnection; they are not planned or operating facility counts.
Active queue requests
Tracked requests currently marked active
Active requested capacity
Requested capacity attributed to this county
2019-2025 complete years
| Year | Tracked requests |
|---|---|
| 2019 | 0 |
| 2020 | 2 |
| 2021 | 1 |
| 2022 | 2 |
| 2023 | 1 |
| 2024 | 4 |
| 2025 | 0 |
Facility facts
Planned and operating facilities
Planned facilities
1,007 MW · EIA-860 final annual generator inventory
Operating facilities
250 MW · EIA-860 final annual generator inventory
Queue request status is not used as a substitute for facility construction or operating status.
Independent operating inventory
Large-scale solar facilities
U.S. Large-Scale Solar Photovoltaic Database (USPVDB)
Observed capacity
Source release 2026-04-14
Mapped site area
Converted from source-reported square meters
Latest operation year
Latest source record represented in this county
This inventory is shown separately from EIA generators and LBNL queue requests to avoid double-counting records across datasets.
Retirement facts
Facility retirements
The EIA-860 final annual generator inventory lists no retired solar facilities in Hopkins County.
Public record attribution
Organizations named in queue requests
| Organization | Queue requests | Capacity | Latest request year |
|---|---|---|---|
| BLUE STONE RENEWABLE XXI LLC | 2 | 249.9 MW | 2024 |
| Palomino Renewables | 2 | 453.7 MW | 2024 |
| Blarney Solar Project LLC | 1 | 81 MW | 2022 |
| BT Claxton Solar, LLC | 1 | 150.6 MW | 2022 |
| CH Solterra LLC | 1 | 143 MW | 2021 |
| Hopkins Energy LLC | 1 | 253.1 MW | 2018 |
| Lucky 7 Solar Farm LLC | 1 | 101.6 MW | 2024 |
| Pine Forest Solar I, LLC | 1 | 301.5 MW | 2018 |
| RWE Solar Development, LLC | 1 | 305.1 MW | 2020 |
| Stampede Solar Project, LLC | 1 | 256.3 MW | 2020 |
A name in an interconnection queue request does not mean the organization is seeking land in this county or has an interest in a particular parcel.
Infrastructure context
Grid infrastructure context
Source: HIFLD electric power transmission lines.
Transmission in county
Highest recorded voltage
Nearest line to county center
County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.