Solar development data in Bell County, Texas
Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.
Interconnection queue requests
Queue activity
Source: LBNL Queued Up interconnection queue dataset. Queue requests are proposals seeking interconnection; they are not planned or operating facility counts.
Active queue requests
Tracked requests currently marked active
Active requested capacity
Requested capacity attributed to this county
2019-2025 complete years
| Year | Tracked requests |
|---|---|
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 6 |
| 2022 | 2 |
| 2023 | 2 |
| 2024 | 0 |
| 2025 | 0 |
Facility facts
Planned and operating facilities
Planned facilities
1,294 MW · EIA-860 final annual generator inventory
Operating facilities
605 MW · EIA-860 final annual generator inventory
Queue request status is not used as a substitute for facility construction or operating status.
Independent operating inventory
Large-scale solar facilities
U.S. Large-Scale Solar Photovoltaic Database (USPVDB)
Observed capacity
Source release 2026-04-14
Mapped site area
Converted from source-reported square meters
Latest operation year
Latest source record represented in this county
This inventory is shown separately from EIA generators and LBNL queue requests to avoid double-counting records across datasets.
Retirement facts
Facility retirements
The EIA-860 final annual generator inventory lists no retired solar facilities in Bell County.
Public record attribution
Organizations named in queue requests
| Organization | Queue requests | Capacity | Latest request year |
|---|---|---|---|
| Limewood Bell Renewables LLC | 2 | 254.6 MW | 2021 |
| Bell 1 Solar, LLC | 1 | 100.4 MW | 2021 |
| Bell 1 Storage LLC | 1 | 100.4 MW | 2022 |
| Ben Milam Solar 3 | 1 | 254 MW | 2020 |
| Big Elm Solar, LLC | 1 | 201 MW | 2019 |
| Big Elm Storage, LLC | 1 | 120 MW | 2022 |
| Butcherbird Solar, LLC | 1 | 116 MW | 2023 |
| Chillingham Solar LLC | 1 | 352.4 MW | 2020 |
| Five Wells Solar Center LLC | 1 | 322.8 MW | 2021 |
| Gransolar Texas Twenty LLC | 1 | 148.2 MW | 2023 |
| Stillhouse Solar LLC | 1 | 210.8 MW | 2021 |
A name in an interconnection queue request does not mean the organization is seeking land in this county or has an interest in a particular parcel.
Infrastructure context
Grid infrastructure context
Source: HIFLD electric power transmission lines.
Transmission in county
Highest recorded voltage
Nearest line to county center
County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.

