Battery storage development data in Victoria County, Texas
Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.
Interconnection queue requests
Queue activity
Source: LBNL Queued Up interconnection queue dataset. Queue requests are proposals seeking interconnection; they are not planned or operating facility counts.
Active queue requests
Tracked requests currently marked active
Active requested capacity
Storage capacity where the queue reports it. Many solar-plus-storage requests list only the solar size.
2019-2025 complete years
| Year | Tracked requests |
|---|---|
| 2019 | 0 |
| 2020 | 1 |
| 2021 | 3 |
| 2022 | 4 |
| 2023 | 0 |
| 2024 | 5 |
| 2025 | 4 |
Facility facts
Planned and operating facilities
Planned facilities
61 MW · EIA-860 final annual generator inventory
Operating facilities
10 MW · EIA-860 final annual generator inventory
Queue request status is not used as a substitute for facility construction or operating status.
Independent operating inventory
The U.S. Large-Scale Solar Photovoltaic Database lists no solar sites with batteries in Victoria County as of its 2026-04-14 release.
This inventory is shown separately from EIA generators and LBNL queue requests to avoid double-counting records across datasets.
Retirement facts
Facility retirements
The EIA-860 final annual generator inventory lists no retired battery storage facilities in Victoria County.
Public record attribution
Organizations named in queue requests
| Organization | Queue requests | Capacity | Latest request year |
|---|---|---|---|
| BRP Blue Topaz 2, LLC | 2 | 252 MW | 2022 |
| GRS BESS Texas Eight LLC | 2 | Not reported | 2024 |
| Oriana Solar LLC | 2 | Not reported | 2021 |
| Arpeggio BESS, LLC | 1 | 200.7 MW | 2025 |
| Bobcat Energy Center, LLC | 1 | 264.2 MW | 2024 |
| BRP Brizo BESS LLC | 1 | 140.8 MW | 2021 |
| Georgia Lynn BESS LLC | 1 | 108.7 MW | 2024 |
| Goldhill Energy Storage LLC | 1 | 200.6 MW | 2024 |
| Nova Clean Energy LLC | 1 | 204.9 MW | 2025 |
| Oak Belt Solar, LLC | 1 | Not reported | 2025 |
| Oak Belt Storage, LLC | 1 | Not reported | 2025 |
| Tejano Storage, LLC | 1 | 152.3 MW | 2022 |
A name in an interconnection queue request does not mean the organization is seeking land in this county or has an interest in a particular parcel.
Infrastructure context
Grid infrastructure context
Source: HIFLD electric power transmission lines.
Transmission in county
Highest recorded voltage
Nearest line to county center
County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.