Battery storage development data in Milam County, Texas

Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.

18Active queue requestsLBNL Queued Up interconnection queue dataset
2,482 MWActive requested capacityRequested, not built
0Operating facilitiesEIA-860 final annual generator inventory
176 miTransmission in countyHIFLD electric power transmission lines

Interconnection queue requests

Queue activity

Source: LBNL Queued Up interconnection queue dataset. Queue requests are proposals seeking interconnection; they are not planned or operating facility counts.

Active queue requests

18

Tracked requests currently marked active

Active requested capacity

2,482 MW

Storage capacity where the queue reports it. Many solar-plus-storage requests list only the solar size.

2019-2025 complete years

024682019: 0 requests2020: 0 requests2021: 0 requests2022: 5 requests2023: 3 requests2024: 3 requests2025: 8 requests2019202020212022202320242025
Tracked requests per complete year
YearTracked requests
20190
20200
20210
20225
20233
20243
20258

Facility facts

Planned and operating facilities

Planned facilities

3

430 MW · EIA-860 final annual generator inventory

Operating facilities

0

0 MW · EIA-860 final annual generator inventory

Queue request status is not used as a substitute for facility construction or operating status.

Independent operating inventory

The U.S. Large-Scale Solar Photovoltaic Database lists no solar sites with batteries in Milam County as of its 2026-04-14 release.

This inventory is shown separately from EIA generators and LBNL queue requests to avoid double-counting records across datasets.

Retirement facts

Facility retirements

The EIA-860 final annual generator inventory lists no retired battery storage facilities in Milam County.

Public record attribution

Organizations named in queue requests

OrganizationQueue requestsCapacityLatest request year
Brahman Renewables2Not reported2024
Grenergy USA2Not reported2025
Rosula Solar LLC2Not reported2023
San Gabriel Solar LLC2Not reported2025
Adelite Storage Project LLC1231.9 MW2022
BETEL STORAGE I1500 MW2025
BETEL STORAGE II1500 MW2025
Champs Elysees Renewables, LLC1256.1 MW2024
DOS RIOS SOLAR, LLC1164.5 MW2022
Milam Energy, LLC1141.2 MW2022
Obbligato BESS, LLC1200.7 MW2025
Pavo Creek Storage, LLC1154.2 MW2025

A name in an interconnection queue request does not mean the organization is seeking land in this county or has an interest in a particular parcel.

Infrastructure context

Grid infrastructure context

Source: HIFLD electric power transmission lines.

Transmission in county

176 miles

Highest recorded voltage

345 kV

Nearest line to county center

0.5 km

County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.

Private comparable contribution

Have an actual offer or signed lease from this county?

Public development records do not tell us what a landowner was offered. Directly submitted terms enter a separate private review workflow and never become a raw public record.

Private submission · reviewer verification required

Share a real battery storage offer or signed lease

If you have been approached about battery storage land here, or have already signed, the terms you remember can help build future comparable coverage for Milam County. A submission does not mean this county currently has comparable coverage. Terms stay private during review, and no raw terms or parcel identity are published.

Source: terms you submit directly, not a public agency dataset. See verification, document retention, and deletion details in the privacy policy.