Development signal · Maverick County, TX · FIPS 48323

Battery storage development data in Maverick County.

Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.

County-specific public records

Development activity

Active projects

5

Tracked public records currently marked active

Active capacity

850 MW

Capacity attributed to this county

Nearest active project

Not available

County-centroid distance, not parcel distance

Five-year public queue activity

YearTracked requests
20221
20231
20241
20251
20260

Public record attribution

Organizations named in public development records

OrganizationProjectsCapacityLatest request year
BRP De Los Santos BESS LLC1201 MW2022
Maverick ESS, LLC1185.6 MW2023
Nova Clean Energy LLC1202.5 MW2024
Regis Escondido LLC110 MWUndated
Sugaree Solar LLC1251.3 MW2025

A name in an interconnection record does not mean the organization is seeking land in this county or has an interest in a particular parcel.

Infrastructure context

Grid infrastructure context

Transmission in county

85 miles

Highest recorded voltage

138 kV

Nearest line to county center

6.2 km

County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.