Battery storage development data in Suffolk County, New York
Public county project and grid context. This is not a lease-rate estimate, property listing, indication of parcel suitability, or evidence that an organization wants to lease a particular property.
Interconnection queue requests
Queue activity
Source: LBNL Queued Up interconnection queue dataset. Queue requests are proposals seeking interconnection; they are not planned or operating facility counts.
Active queue requests
Tracked requests currently marked active
Active requested capacity
Storage capacity where the queue reports it. Many solar-plus-storage requests list only the solar size.
2019-2025 complete years
| Year | Tracked requests |
|---|---|
| 2019 | 20 |
| 2020 | 17 |
| 2021 | 18 |
| 2022 | 13 |
| 2023 | 11 |
| 2024 | 35 |
| 2025 | 0 |
Facility facts
Planned and operating facilities
Planned facilities
282 MW · EIA-860 final annual generator inventory
Operating facilities
10 MW · EIA-860 final annual generator inventory
Queue request status is not used as a substitute for facility construction or operating status.
Independent operating inventory
The U.S. Large-Scale Solar Photovoltaic Database lists no solar sites with batteries in Suffolk County as of its 2026-04-14 release.
This inventory is shown separately from EIA generators and LBNL queue requests to avoid double-counting records across datasets.
Retirement facts
Facility retirements
The EIA-860 final annual generator inventory lists no retired battery storage facilities in Suffolk County.
Public record attribution
Organizations named in queue requests
| Organization | Queue requests | Capacity | Latest request year |
|---|---|---|---|
| Caithness LI Energy Storage, LLC | 2 | 90 MW | 2020 |
| East Setauket Energy Storage, LLC | 2 | 373 MW | 2024 |
| ACE DEVCO NC, LLC | 1 | 100 MW | 2024 |
| Edwards Calverton Battery Storage | 1 | 60 MW | 2021 |
| Hanwha Q CELLS USA Corp. | 1 | 75 MW | 2024 |
| Holtsville Brookhaven Battery Storage LLC | 1 | 79.9 MW | 2021 |
| Holtsville Energy Storage, LLC | 1 | 110 MW | 2019 |
| KCE NY 21, LLC | 1 | 60 MW | 2024 |
| KCE NY 29, LLC | 1 | 79 MW | 2020 |
| KCE NY 30, LLC | 1 | 50 MW | 2024 |
| KCE NY 31, LLC | 1 | 50 MW | 2024 |
| KCE NY 37, LLC | 1 | 150 MW | 2024 |
A name in an interconnection queue request does not mean the organization is seeking land in this county or has an interest in a particular parcel.
Infrastructure context
Grid infrastructure context
Source: HIFLD electric power transmission lines.
Transmission in county
Highest recorded voltage
Nearest line to county center
County infrastructure does not establish available grid capacity. A specific project requires parcel-level engineering and an interconnection study.